|
Subhash C. Sarin and Sameer T. Shikalgar Grado Department of Industrial and Systems Engineering Two methodologies have been developed to effect a reduction in the cycle time. The first methodology is a heuristic procedure based on the idea of reducing idle time on the bottleneck machine. The second methodology is based on mathematical programming. The proposed methodologies are implemented using the data obtained from the M/A-COM's wafer fabrication facility in Roanoke, Virginia. The facility consists of ninety-two machines and its products can be classified into six different types. The performance of one of the proposed methodologies is compared with that of the policies currently followed at the M/A-COM facility in Roanoke, Virginia and the results are presented.
|